How it works

Scroll, and watch a site run itself.

Five real workflows, played out inside the app. Scroll forward and back, you control the pace.

SCENE 01 · CHAT TO APPROVAL

One message becomes a record.

Suresh types what he needs, in plain chat. Brik detects the indent and structures it. The office sees the card the same second. One click. Approved, PO drafted.
From chat chaos to an audit trail, in one message.
brikito
S
Tower B · Site TeamSuresh · Site Engineer
Need 50 bags of cement for Tower B slab by Friday.9:18
Indent detected
INDENT #142PendingApproved
MaterialOPC 53 cement
Qty50 bags
SiteTower B · slab
Need byFriday
Indent #142 approved · PO drafted
APPROVALS · PROJECT HEAD
IND #140 · Steel 8 mm · 1.2 tCLEARED
IND #142 · OPC 53 · 50 bagsPendingApproved
Tower B slab · need by Friday · raised by Suresh
IND #139 · Binding wire · 40 kgCLEARED
SCENE 02 · ASK BRIK AI ANYTHING

The site answers back.

Ask in plain language. Progress, counted and flagged. Follow up like you would with a person. A month of attendance, in one glance.
Your site's memory, on demand.
brikito
B
Brik AIonline · always on
What was my progress last week?18:02
0%of week's plan done
  • L7 slab shuttering finished
  • Column cages C4 to C9 tied
  • Block B plumbing first fix started
Waterproofing crew 2 days behind
And my attendance last month?18:03
24 / 26 days present
SCENE 03 · CCTV INTELLIGENCE

Four feeds. One sentence each.

The cameras you already have, watched 24/7. Progress and people, read from the frame. Stock counted on the shelf. Idle time flagged, to the minute.
Cameras you already have. Eyes you never did.
CAM 01 · GATESIMULATED FEEDin 42 · out 9
CAM 02 · L7 SLABSIMULATED FEEDcrew · 14
CAM 03 · STORESIMULATED FEEDcement · 134 bags
CAM 04 · HOISTSIMULATED FEEDcage · active
SITE SUMMARY · LIVE
PROGRESSslab shuttering ~60% · Tower B
ON SITE42 labour · 3 engineers · gate cam
STOREcement 134 bags · steel 2.1 t
CREWpour active 6.2/8 hrs · idle 14:10 to 14:40
SCENE 04 · DRAWING TO PAPERWORK

Drop a drawing. Get the takeoff.

Drag the structural drawing in. Pick what you need. BOQ, BBS or fabrication. Brik reads the dimensions off the sheet. Quantities, bar schedule, bending sheet. Done.
Upload the drawing. The paperwork builds itself.
STR-104.pdf
BOQBBSFABRICATION
ITEMQTY
Cement OPC 5380 bags
Steel Fe550 · 10 mm752 kg
RCC M258.56 m³
Shuttering64 m²
Excavation22 m³
BAR · SHAPENOS
10 mm stirrup · 6" c/c412
12 mm straight · 4.8 m96
10 mm L-bend · 1.85 m124
8 mm crank · 2.1 m64
cut 1.85 · bend 90°
cut 4.80 · straight
cut 2.10 · crank
GENERATING CUTTING PLAN
SCENE 05 · COST · TIME · PROGRESS

It sees the slip. Then it plans the save.

Planned, earned and spent, on one curve. The gap is money. The bracket is time. Brik drafts a recovery plan. Handover pulled back six weeks.
It doesn't just show the slip. It plans the catch-up.
plannedearnedspent
~10 wks behind
Recovery plan ready
Finishing trades re-sequenced
Night pour added · L8 slab
Steel and cement pre-ordered
Handover · 14 Mar31 Janback 0 wks
AND EVERYTHING ELSE

The rest of the toolbelt.

Selfie attendanceGeofenced check-in, straight to payroll.
Rev C
Revision control“You're on Rev C” before the wrong wall goes up.
AI meeting minutesDecisions and owners, drafted as you hang up.
Auto DPRDaily progress reports drafted from site photos.
Safety flagsMissing PPE and edge risks, raised instantly.
SkylineMetro D2
Multi-projectSwitch workspaces without switching apps.
Shared workspaceDeveloper and contractor on the same record.
Voice to updateHindi or Tamil voice note in, structured update out.