About Brikito CONSTRUCTION MADE SIMPLE

We're building the operating system for construction.

Brikito puts the whole site into one simple app, with Brik AI inside. Every message, photo and voice note becomes a record, an approval, a report and a live view of the project, without anyone on site learning a new way of working.

Our story

Construction runs on chat. Its software never did.

On most sites, the real work happens across WhatsApp groups, paper registers, drawing folders, email and spreadsheets. Cost leaks between them, and people lose hours chasing what was already said.

Construction software was supposed to fix that. But the single largest reason it fails is simple: the people on site won't use it. Forms and portals lose to a voice note every time.

So we started from the other end. Brikito is as simple as the chat your crew already uses, in their own language, and Brik AI does the structuring in the background, so the office gets the record without the site doing extra work.

2026 · Now

Pilot on live sites

Three live projects run from one login, with Brik AI built into every screen.

In development

BrikChat

The site chat with Brik inside: capture, tag, structure and approve in one place.

Next

BrikDocs

Version-controlled drawings and one-tap reports: BBS, BOQ, DPR, GRN and more.

On the runway

BrikMail & BrikVision

A project mailbox Brik drafts from, and AI on your site cameras, 24/7.

Our mission

Make construction simple to run, for every site team.

From the engineer on the slab to the developer running a portfolio, one app that everyone actually uses.

Our vision

The AI operating system for real estate development.

One system that runs a project from foundation to handover, with AI that drafts and people who decide.

What we stand for

Four non-negotiables, written before the code.

01 · Authority

Your PM is the checker. Always.

Nothing is auto-sent. Every reply, indent and order is drafted by Brik and held until your project manager approves it.

02 · Grounding

Answers from your project. Nothing else.

Every figure Brik gives comes from your live project data, not a generic template or an invented number.

03 · Adoption

Built for the site, not the office.

One app, in the languages the crew speaks, as simple as the chat they already use.

04 · Privacy

Presence, not surveillance.

Each person sees only what their role permits. Data is hosted in India and exportable on demand.

Pilot · 2026

Already running on live sites.

6→1

WhatsApp, registers, drawings, email and spreadsheets, now one app.

3

Live projects from one login: residential, metro and logistics.

92%

On-site attendance captured by selfie. No register, no proxy.

9d

Schedule slip surfaced live on the dashboard, not at quarter-end.

My whole site runs in one app now, and I approve the day's indents before I've finished my chai.
SR Ilangovan · Director, Gofar Group
Aashiq Ahamed, Founder of Brikito
Aashiq AhamedFounder · Brikito
Meet the founder

Aashiq Ahamed

Founder, Brikito · Construction Tech & AI Entrepreneur

Aashiq founded Brikito to make AI-powered construction management simple enough for every site team to use, from the engineer on the slab to the developer running a portfolio.

Through Brikito, he is building the AI operating system for real estate development, starting with one app the whole site actually uses.

AI-powered construction managementConstruction technologyStartup building
Meet the team

The people building Brikito.

The people behind the product, building the app we wished every construction site had.

Brikito team members working together around a table with laptops, construction drawings and a safety helmet in a bright office
The Brikito team Construction made simple

Want to build the future of construction with us?

We're always glad to hear from engineers, designers and construction people.

Get in touch

Let's build your next project together.

Tell us about your sites and team. We'll set you up on one live project and have it running the same day.