BrikChat, the site chat with Brik AI inside IN DEVELOPMENT

The site chat that turns messages into work.

BrikChat replaces scattered WhatsApp groups with one chat for the whole project. Brik AI reads every message, voice note, photo and PDF, tags it as an update, attendance, enquiry or ticket, and routes it to the dashboard or to your PM for approval.

Groups · DMs · Voice notesAuto-tagged messages7 Indian languages
BRIK AI · capture streamSkyline Tower B, Site Teamthis morning
8:42Rajesh · EngineerTEXTUPDATESlab L7 cast · 142 cum · cubes taken for testing
8:46Anil · SupervisorVOICE 0:21ATTENDANCE48 present · 3 absent · logged to dashboard
8:55Fatima · ArchitectTEXTENQUIRYL4 plumbing layout, reached site? · Rev 2 linked
9:07Kumar · SafetyPHOTOTICKETOpen edge at L6 stairwell · flagged to Priya
9:18Suresh · ContractorTEXTTICKET50 bags OPC 53 · Block B · indent IND-2041 raised
9:18Brik AIINDENTROUTEDStructured · sent to Priya (PM) · awaiting approval
6 of 142 messages today+ 3 approvals awaiting Priya (PM)
The problem with site chat today

Your site already runs on chat. The chat just doesn't run anything.

Every construction team coordinates over WhatsApp because it is fast and everyone has it. But a message is not a record, a voice note is not an indent, and a group thread is not an approval.

Today

Decisions get buried in group threads.

The quantity, the drawing revision and the go-ahead were all said, somewhere, three hundred messages ago.

With BrikChatEvery message is tagged and searchable, and anything actionable is pulled out as a structured item linked to the original.
Today

Voice notes nobody can search.

Supervisors speak faster than they type, so updates arrive as voice notes the office has to listen to one by one.

With BrikChatVoice notes in seven Indian languages are transcribed, tagged and turned into the update or indent they describe.
Today

Project history lives on personal phones.

When an engineer leaves the project, their chats, photos and context leave with them.

With BrikChatGroups belong to the project. New team members join with the full history and the right access for their role.
What BrikChat does

Familiar like WhatsApp. Built for a construction site.

Your team keeps the habits they already have. BrikChat adds the structure the office needs, with Brik AI reading every message.

01

Project groups & DMs

Groups by project, block, trade or contractor, plus private DMs and a private chat with Brik, all in one inbox.

GROUPS · DMs · BRIK AI
02

Every message auto-tagged

Brik tags the intent of each message as an update, attendance, enquiry or ticket, so nothing actionable slips through.

UPDATE · ATTENDANCE · ENQUIRY · TICKET
03

Voice notes, transcribed

Speak in English, Hindi, Marathi, Tamil, Telugu, Kannada or Bengali. Brik writes it down and pulls out the numbers.

SPEAK · TRANSCRIBE · STRUCTURE
04

Material indents from chat

"Need 50 bags OPC 53 for Block B" becomes a structured indent with quantity, grade and location, routed for approval.

INDENT · APPROVAL · PO
05

Progress to the dashboard

Updates, attendance counts and flags posted in chat flow straight into the live project dashboard, no retyping.

PROGRESS · MANPOWER · FLAGS
06

Drawings, linked in context

Ask "has Rev 2 reached site?" and Brik links the latest tagged revision right in the thread.

LATEST REVISION · IN THREAD
BRIKCHAT · TWO WAYS TO WORK v1.0 · the chat with Brik AI inside
A.Inside your project chats

Brik reads everything posted. You see the structured version.

Every voice note, image and document is captured with sender, time and type. Brik tags the intent, pulls out the figures and turns it into something actionable: a material indent, an attendance count, a progress update or a flag, each one linked back to the original message.

CapturesVoice · Photo · Video · PDF · Drawing
TagsUpdate · Attendance · Enquiry · Ticket
Turns intoIndents · Approvals · Progress · Flags
Routes toDashboard · PM approval · Documents
TAGGED TODAYSkyline Tower B142 msgs
31UpdatesTEXT+VOICEUPDATEFeeds progress vs plan · dashboard
6AttendanceVOICEATTENDANCEGang counts by contractor · DLR
9EnquiriesTEXTENQUIRYAnswered or assigned · 2 open
4TicketsPHOTOTICKETIndents and issues · 3 awaiting PM
92 chit-chat messages ignored0 retyped by the office
B.Privately, with Brik

Anyone on the project can DM Brik like a person.

The engineer checking cement stock. The contractor chasing an approval. The PM glancing at progress before a client call. Any team member opens a private chat with Brik and asks in plain language. Brik answers from live project data, scoped to their role, and can draft the order or message right there.

AskShow last week's progress
AskCement stock in Tower B?
AskDraft a material order
AskPending approvals
ScopeEach person sees only what their role permits.
B
Brikonline · always on
Cement stock in Tower B?15:40
Tower B · OPC 53 CementOn hand · 12 bags at site storeOpen indent · IND-2041 · 50 bagsBelow reorder level. Draft a PO to UltraTech?15:40
Yes, draft it15:41
PO-2291 · drafted50 bags OPC 53 · vendor UltraTechSent to Priya (PM) for approval. I'll confirm here once signed.15:41
BrikChat vs WhatsApp

Keep the speed of WhatsApp. Lose the chaos.

WhatsApp is a great personal messenger. A construction project needs a chat that also keeps records, routes approvals and knows who is allowed to see what.

On a construction site
WhatsApp groups
BrikChat
Material requests
A message someone must notice and retype
A structured indent, routed for approval
Voice notes
Listen one by one, not searchable
Transcribed in 7 languages and tagged
Attendance & progress
Copied into Excel by the office
Flows to the live dashboard automatically
Drawings
Old revisions forwarded and re-forwarded
Latest tagged revision linked in thread
Access
Anyone in the group sees everything
Role-based, per project
When someone leaves
History leaves on their phone
History stays with the project
Answers
Scroll up and hope
Ask Brik, get the source
How it works

From voice note to approved indent. Before lunch.

01

Someone posts

A contractor sends a voice note in Tamil: 50 bags of OPC 53 needed for Block B tomorrow.

02

Brik reads it

The note is transcribed, tagged as a ticket, and quantity, grade and location are extracted.

03

Brik structures it

An indent is raised, stock is checked and a PO is drafted to the usual vendor.

04

The PM approves

Priya sees the indent with its source message and approves in one tap. The site gets confirmation in the chat.

Who it's for

One chat. Everyone on the project.

Site engineer & supervisor

Report the way you already talk.

Send updates and voice notes. No forms, no registers, no end-of-day Excel.

Project manager

See the structured version of the day.

Updates, indents and flags arrive tagged, with approvals waiting in one place.

Contractors & vendors

Get answers without chasing.

Ask Brik about your indents, approvals or the latest drawings, scoped to your work.

Developer & owner

A record of every decision.

Every instruction, approval and change sits with the project, searchable for years.

Questions

BrikChat, answered.

Is BrikChat a WhatsApp alternative for construction teams?

Yes. BrikChat feels as familiar as WhatsApp, with groups, DMs, voice notes and photos, but it belongs to the project instead of personal phones. Brik AI reads every message and turns it into structured work, so decisions, quantities and approvals do not get buried in a group thread.

Why is WhatsApp not enough for construction site communication?

WhatsApp was built for personal messaging. On a construction project it scatters decisions across dozens of groups, makes voice notes impossible to search, leaves no structured record of indents or attendance, and keeps project history on personal phones that leave when people do.

Does my site team need training to use BrikChat?

Very little. If your team can send a WhatsApp message or voice note, they can use BrikChat. They keep talking the way they do today; Brik AI does the structuring in the background.

Can site teams send voice notes in regional languages?

Yes. BrikChat understands English, Hindi, Marathi, Tamil, Telugu, Kannada and Bengali. Voice notes are transcribed and tagged so the office can read and search them.

Does Brik AI reply or place orders in the chat automatically?

No. Brik drafts replies, indents and orders, and the right person approves them before anything is sent.

Is BrikChat available now?

BrikChat is in active development and is the first product on the Brikito roadmap. Book a demo to see it on one of your live projects and join early access.

Move your site chat onto Brikito.

45 minutes. We'll set your team up on one live project and show you their messages turning into work the same day.