BrikDocs, construction reports & documents NEXT

Every construction report, generated in a tap.

No more late nights in Excel. BrikDocs builds your DPR, DLR, BOQ, BBS, GRN and stock statements from the work your team already logged in Brikito, and keeps every drawing version-controlled with the latest revision tagged on site.

One tap, ready in secondsBuilt from logged workShare or print as PDF
What the site logged todayTower B
  • 8:42Slab L7 cast · 142 cumRajesh · text in Site Team
  • 8:4648 present · 3 absentAnil · voice note, Tamil
  • 9:1850 bags OPC 53 requestedSuresh · indent IND-2041
  • 13:52TMT 12 mm · 4.2 t receivedStores · GRN-0388
  • 16:10L6 blockwork 70% · photosRajesh · 3 photos
BrikDocs · generatedDPR · PDF
Daily Progress ReportDPR-0612 · Skyline Tower B
Manpower48 / 51
Concrete142 cum
Plan status2 days behind
ActivityLocationTodayCum.
Slab castingL7100%100%
BlockworkL6+15%70%
Steel receivedStore4.2 t38.6 t
Prepared by Brik AI · 18:05Approved · Priya (PM)
Why reporting takes so long

The site did the work once. The office types it up three times.

The same quantities get keyed into the DPR, the stock register and the client update, by different people, in different spreadsheets. BrikDocs writes them once, from the source.

Today

Late nights in Excel.

Engineers finish on site, then spend the evening compiling the DPR from chats, registers and memory.

With BrikDocsThe DPR is generated from the day's updates, attendance and material entries, ready to review and share.
Today

The wrong revision on site.

An old drawing forwarded on WhatsApp gets built from, and the rework bill arrives weeks later.

With BrikDocsEvery drawing is version-controlled and the latest revision is tagged, so the site always works from the current one.
Today

Reports that don't agree.

The DPR says 4 tonnes of steel came in, the stock statement says 3.6. Nobody knows which is right.

With BrikDocsEvery report draws on the same logged records, so DPR, GRN and stock statement match by design.
The report library

Every report your project needs. One tap each.

Each report is built from records your team already keeps in Brikito, so there is nothing extra to fill in.

DPR

Daily Progress Report

Work done against plan, manpower, materials, issues and photos for the day.

Built from · updates, attendance, GRN
DLR

Daily Labour Report

Team-wise and contractor-wise attendance, hours, OT and exceptions.

Built from · selfie check-in, voice counts
BOQ

Bill of Quantities

Itemised quantities and rates for the scope, kept in step with measurements.

Built from · drawings, measurements
BBS

Bar Bending Schedule

Bar marks, shapes, diameters, cut lengths and weights for every member.

Built from · structural drawings
EST

Estimation

Material and cost estimates for an activity, floor or the whole project.

Built from · BOQ, rates, consumption
SCH

Schedule

Activity schedule with plan vs actual and the slippage on each line.

Built from · weekly plans, progress
FAB

Fabrication Drawing

Shop-ready fabrication details issued with the latest revision tagged.

Built from · drawing library
GRN

Goods Received Note

What arrived, against which PO, in what quantity and condition.

Built from · PO, gate and store entries
STK

Stock Statement

Opening, received, issued and closing stock for every material.

Built from · GRN, issues, indents
IndentPurchase OrderMeasurement BookInspectionSnag listExpense+ more
BRIKDOCS · BEYOND REPORTS drawings · search · minutes
A.Drawings & documents, version-controlled

One library for the project. The latest revision, always tagged.

Drawings, structural plans, BOQs, agreements and certificates live in one place, with every revision kept. The current one is tagged for the site, and anyone asking in BrikChat gets the right version linked in the thread.

StoresDrawings · Structural plans · BOQ · Agreements · Certificates
TracksEvery revision, who issued it and when
TagsThe latest revision for the site, automatically
LinksInto BrikChat threads when someone asks
DOCUMENTS · Tower BPlumbing · L44 files
Rev 2L4 plumbing layoutPDFLATESTIssued by Fatima · tagged on site
Rev 1L4 plumbing layoutPDFSUPERSEDEDKept for reference · not for construction
Rev 3L4 slab reinforcementDWGLATESTBBS generated · 12.4 t steel
v1Plumbing contractPDFAGREEMENTSigned · linked to vendor
0 outdated drawings in circulationHistory kept
B.Ask your documents

Search specs and approvals in plain language. Get the page, not a guess.

Brik searches across specifications, method statements and approvals and answers with the source document attached. Upload meeting minutes and Brik turns them into action items with owners, so nothing agreed in the meeting is lost.

AskCuring period for the L7 slab per spec?
AskWas the tile change approved?
MinutesTurned into action items with owners and dates
AnswersAlways with the source document and page
B
Brik · BrikDocssearching project documents
Curing period for the L7 slab per spec?10:04
Spec · Concrete worksMinimum 7 days moist curing for OPC slabsSource · Spec-CW-03, p.1410:04
Was the tile change for L3 approved?10:06
ApprovalsApproved by the client on 02 JunSource · APR-117, linked10:06
How it works

Logged once. Reported everywhere.

01

The site logs the work

Updates, voice notes, attendance, indents and deliveries are captured in BrikChat and Brikito as they happen.

02

Brik structures it

Quantities, locations and activities are extracted and linked to the plan, the PO and the drawing.

03

Tap to generate

Pick the report and the period. BrikDocs assembles it in seconds from the same records.

04

Review and share

The right person reviews and approves, then shares the PDF with the client, the office or the lender.

Who it's for

Less typing. More building.

Site engineer

Your evening back.

The DPR is drafted from what you already sent during the day. Review it, don't write it.

Quantity surveyor

Quantities that tie out.

BOQ, BBS, GRN and stock statements draw on the same records, so the numbers reconcile.

Project manager

Client-ready on request.

Branded progress reports and PDFs for any period, without chasing the site for inputs.

Developer & owner

One version of the truth.

Every drawing, approval and report for every project, searchable and current.

Questions

BrikDocs, answered.

What is a DPR in construction?

A DPR, or Daily Progress Report, records what happened on a construction site in a day: work completed against plan, manpower, materials received and used, equipment, issues and photos. BrikDocs builds the DPR automatically from the updates, attendance and material entries your team already posted.

What is a BBS in construction?

A BBS, or Bar Bending Schedule, lists every reinforcement bar in a structural member with its shape, diameter, cut length, number and weight. It is used to cut and bend steel correctly and to estimate steel quantities. BrikDocs is designed to generate the BBS alongside fabrication drawings.

Which construction reports can BrikDocs generate?

BrikDocs covers DPR, DLR, BOQ, BBS, estimation, schedules, fabrication drawings, GRN and stock statements, along with client-ready PDFs for indents, purchase orders, measurement books, inspections, snags and expenses.

Where does the data for each report come from?

From the work already logged in Brikito: progress updates and voice notes in BrikChat, selfie attendance, indents, POs and GRNs, and the drawings in your document library. Nobody has to fill a separate form at the end of the day.

How does BrikDocs handle drawing revisions?

Every drawing, structural plan, BOQ, agreement and certificate is version controlled. The latest revision is always tagged, so the site works from the current drawing and older revisions stay available for reference.

Is BrikDocs available now?

Standard DPR and DLR PDF reports are part of every Brikito plan today, with comprehensive reports and client-ready PDFs in Professional. The full BrikDocs suite, including AI document search and drawing revision control, is next on the roadmap and available to Enterprise customers as a pilot. See pricing.

Close Excel. Tap for the report.

45 minutes. We'll set your team up on one live project and generate your first DPR from their real messages.