What does one day of delay cost your project?

Enter a few numbers from your site. See your daily cost of delay in seconds, then get the full breakdown and a PDF report by email.

Your project

Rough figures are fine. Everything updates as you type.

1 · Project

2 · Site overheads

3 · Idle labour

4 · Equipment & finance

5 · Optional

One day of delay costs you

₹1.8 lakh / day

Get the full breakdown + PDF report

See exactly where your delay money goes, with ways to cut it. We’ll email you a PDF you can share with your team.

Free. You’ll also get the Brikito newsletter; unsubscribe anytime. See our privacy policy.

How the delay cost is calculated

A delayed site keeps spending even when work stops. The calculator adds up the costs that run every calendar day of delay.

CostHow it is worked out
Site overheadsThe daily figure you enter: staff, site office, security, utilities and insurance.
Idle labourWorkers left idle × average daily wage.
Idle equipmentDaily hire you keep paying for machines standing idle.
Finance costLoan or capital deployed × interest rate ÷ 365.
Deferred revenueRent, lease or sales receipts pushed back each day (optional).
Liquidated damagesProject value × LD % per week ÷ 7, if your contract has an LD clause (optional, uncapped).

This is an estimate to help you size the problem. It does not include escalation in material prices, extended supervision fees or claims, which usually make a real delay cost more.

Three ways to stop paying for delays

See slippage on day one

Compare planned vs actual every day, not at the monthly review. A 2-day slip is cheap to recover; a 3-week slip is not.

Turn hindrances into actions

Every blocker needs an owner and a date: a drawing awaited, a delivery late, an inspection pending. Chase the owner, not the site.

Stop idle labour and machines

Know tomorrow's inputs today. If cement or a drawing will not arrive, move the crew and the crane before they stand idle.

Brikito tracks delay and lag automatically from your site's daily updates: slippage, PPC, hindrances with owners and a forecast finish date. Read the scheduling and delay management guide.

Frequently asked questions

How do you calculate the cost of construction delay per day?

Add the costs that keep running every day of delay: site overheads, idle labour (workers × daily wage), idle equipment hire, interest on the capital deployed (amount × annual rate ÷ 365), any rent or revenue deferred, and liquidated damages if your contract has them.

What is a typical cost of delay on an Indian building project?

It depends on project size and financing. For a ₹50 crore residential project with ₹20 crore deployed at 11%, about 40 idle workers and ₹35,000 of daily hire, the daily cost comes to roughly ₹1.8 lakh, before any liquidated damages.

What are liquidated damages (LD) in construction?

Liquidated damages are a pre-agreed amount a contractor pays the owner for each week of delay beyond the contract completion date, often 0.5% of contract value per week, capped at 5–10% of the contract value.

Is my data stored?

Only if you ask for the report: we save your inputs and contact details to send the PDF and follow up. The calculator itself runs in your browser.